Slab and footing estimator · US units
Concrete Calculator: Cubic Yards, Bags & Cost
Free concrete calculator. Enter a slab, footing or post hole and get cubic yards, 80 lb bags, tons and cost, with bag yields and pour quantities on one slip.
Enter your measurements to get an order slip you can read at the counter.
What this concrete calculator gives you
Enter the area you are pouring and the thickness, and the slip returns four numbers that decide your order: cubic yards, the number of 80 lb bags, the weight in tons, and the material cost at your local price. Concrete is the one material where the bag count matters as much as the volume, because most homeowners buy bags and most slab jobs need a truck. Seeing both on the same slip tells you which one you are doing.
How to use it
- Pick the shape. Rectangle for slabs, pads and driveways. Circle for a round patio or a fire pit base. Triangle for a corner pour. Or type the square footage if you already measured.
- Enter the thickness. Four inches is a patio, walkway or shed floor. Five to six inches is a driveway or anything a vehicle parks on. Footings and post holes run deeper.
- Choose a waste allowance. Ten percent is normal for a slab on flat ground. Fifteen to twenty percent for an uneven subgrade, a deep footing, or a pour against forms you built yourself.
- Type your local price. The default is a placeholder for bagged concrete at a hardware store. If a ready-mix truck is quoting you per cubic yard, switch the unit and the cost line follows.
- Read the bold line. That is what to order including waste. Copy it into a message for the plant or the store.
The formula, step by step
- Square feet = length x width. For a circle, diameter squared x 0.785. For a triangle, base x height / 2.
- Cubic feet = square feet x thickness in feet. Four inches is 0.333 feet, six inches is 0.5 feet.
- Cubic yards = cubic feet / 27. A yard is 3 feet on each side, and 3 x 3 x 3 = 27.
- Bags of 80 lb = cubic feet / 0.6, because one 80 lb bag yields about 0.6 cubic feet.
- Weight = cubic feet x 145 pounds per cubic foot / 2000, for tons.
The waste percentage is applied before the conversions, so every number on the slip already includes it. Bags are rounded up, since you cannot buy part of a bag.
Bag yields: how many bags make a yard
This is the conversion people get wrong most often, so here it is in one place:
- One 80 lb bag yields about 0.6 cubic feet.
- One 60 lb bag yields about 0.45 cubic feet.
- One cubic yard is 27 cubic feet, which is 45 bags of 80 lb or 60 bags of 60 lb.
- A 10 foot by 10 foot slab at four inches is 33.3 cubic feet, so 56 bags of 80 lb before waste.
Bagged concrete is convenient and heavy. Forty-five bags is over 3,600 pounds sitting on a pallet, and you have to move every one of them to the pour, usually with a wheelbarrow and a hose.
How far a cubic yard of concrete goes
A cubic yard poured at a given thickness covers:
- 2 inches deep: about 162 square feet.
- 3 inches deep: about 108 square feet.
- 4 inches deep: about 81 square feet.
- 5 inches deep: about 65 square feet.
- 6 inches deep: about 54 square feet.
That 81 square feet at four inches is why a 10 by 10 slab is almost exactly one and a quarter yards. Anything bigger than about 100 square feet at four inches starts to make a truck worth pricing.
A worked example
You are pouring a 10 foot by 10 foot shed floor at four inches, and the store sells 80 lb bags at 5.50 dollars.
- Area: 10 x 10 = 100 square feet.
- Volume: 100 x 0.333 feet = 33.3 cubic feet.
- Yards: 33.3 / 27 = 1.23 cubic yards.
- With ten percent waste: 36.7 cubic feet, or 1.36 cubic yards to order.
- Bags: 36.7 / 0.6 = 61.1, rounded up to 62 bags of 80 lb.
- Weight: 36.7 x 145 = 5,321 pounds, or about 2.7 tons.
- Cost at 5.50 per bag: 62 x 5.50 = about 341 dollars.
Now price the same job as ready-mix. A plant usually has a minimum yardage and a short-load charge for anything under three or four yards, so a small slab often costs more from a truck even though the concrete itself is cheaper per yard. Get both numbers before you decide.
Ready-mix truck or bags
- Under about one yard: bags, always. A truck will not deliver that small without a short-load fee that costs more than the concrete.
- One to three yards: call the plant and ask for the delivered price and the short-load fee, then compare to the bag count. This is the range where either answer is defensible.
- Over three yards: ready-mix. Chasing 150 bags with a wheelbarrow is a full weekend and usually ends in cold joints.
- Ask about the chute reach. A standard truck chute reaches about 16 to 18 feet from the rear. Farther than that and you are pushing concrete in a wheelbarrow, which costs you more than the delivery charge saves.
Waste, slope and overpour
Order short and you cannot add concrete to a pour that has started to set. That is why waste matters more here than for sand or gravel. On a flat slab, ten percent covers uneven subgrade and spillage. Add more when the ground is rough, when the forms are not perfectly square, or when the pour is a footing that will not be visible and can be slightly overfilled. Never plan to reuse leftover concrete: it sets in the wheelbarrow and gets dumped.
Questions people ask
How many bags of concrete do I need for a 10x10 slab? About 56 bags of 80 lb at four inches before waste, or 62 with ten percent waste. That is 1.23 cubic yards, or 1.36 with waste.
How many 80 lb bags are in a cubic yard? 45, because each bag yields 0.6 cubic feet and a yard holds 27 cubic feet.
How much does a cubic yard of concrete weigh? About 4,000 pounds, or two tons, at 145 pounds per cubic foot. Wet concrete is close to this; it does not lighten much as it cures, it just loses water.
How thick should a slab be? Four inches for patios, walkways and shed floors. Five to six inches for driveways and anything a truck drives on. Footings follow the plans, not a rule of thumb.
How much does a yard of concrete cost? It varies by region and by season, so the calculator asks for your price instead of guessing. Ask the plant for the delivered price per yard plus the short-load and environmental fees, then compare that total to the bag count.
Should I order extra? Yes, ten percent on a slab. Finishing a pour short means a cold joint in the middle of your slab, and no supplier will bring you half a yard in time.
Is this the same as a paver base calculator? No. Paver base is crushed stone under the pavers, at a different density and depth. Use the paver base calculator for that base and this one for the concrete itself.
Estimates only. Confirm density and price with your supplier before ordering.